DTR:
WIDE HIGH-GRADE GOLD AT COLOSSEUM
70.1 metres at 6.53g/t Au
Highlights
• 70.1m @ 6.53g/t Au in drill hole CM23-14 Inc. 25.9m @ 15.31g/t Au.
• Consistency of assay results for drill hole CM23-14 suggests stability in the
geologic structure.
• Multi-element geochemistry analysis of drill hole CM23-14 is underway.
• New hole, CM24-15, is almost complete and will test the southern
extension of the sedimentary unit. Results are expected in March 2024.
• Mineral Dynamics researchers confirm Colosseum drill hole data fits a Log
Normal Energy distribution.
Dateline Resources Limited (Dateline or the Company) is pleased to announce it
has received assay results for diamond drillhole, CM23-14, drilled at the Colosseum
Gold Project in San Bernardino County, California, USA, that intersected
70.1m @ 6.53g/t Au, including a higher grade section of 25.9m @ 15.31g/t Au.
Drill hole CM23-14 is the eigth exploratory hole the Company has completed at
the Colosseum project.
Highlights of the drill results to date are:
• 70.1m @ 6.53g/t Au inc. 25.9m @ 15.31g/t Au in drill hole CM23-14
• 100m @ 4.16g/t Au in drill hole CM22-051
• 10.67m @ 13.71g/t Au in drill hole CM22-042
• 19.17m @ 1.81g/t Au in drill hole CM23-093
• 81.35m @ 2.57g/t Au inc. 36m @ 3.97g/t Au in drill hole CM23-11a4
• 76.2m @ 8.62g/t Au inc. 23.5m @ 21.8g/t Au in drill hole CM23-084
Commenting on the results, Managing Director, Stephen Baghdadi, commented:
“The wide intersection in drill hole CM23-14, that includes a higher grade zone, is
consistent with other drill holes that have been completed.
“The results from drill hole CM23-14 have increased the size of the sedimentary
breccia unit and the higher grade mineralised envelope within that unit. It has also
increased our confidence in the current geologic model for the Colosseum deposit.
“An intersection of 70.1m @ 6.53g/t that includes 25.9m @ 15.31g/t Au, is very
encouraging and when added to the data from previous drill holes, it reinforces our
confidence in the stability of the geologic structure.
“Drill hole CM24-15 is underway and is designed to test south east and down dip
extension of the sedimentary breccia. This drill hole is almost complete and sections
of the drill core have been sent to the lab for priority processing”.
refer to todays ann. for more info.
glall
- Forums
- ASX - Short Term Trading
- Short Term Trading Week Starting: 12 Feb
DTR:WIDE HIGH-GRADE GOLD AT COLOSSEUM70.1 metres at 6.53g/t...
-
- There are more pages in this discussion • 74 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
ATC
ALTECH BATTERIES LTD
Martin Stein, CFO
Martin Stein
CFO
Previous Video
Next Video
SPONSORED BY The Market Online