DTR:Colosseum Delivers More High Grade Gold...

  1. 1,702 Posts.
    lightbulb Created with Sketch. 49
    DTR:

    Colosseum Delivers More High Grade Gold Intercepts

    Highlights

    • Results received from diamond and reverse circulation (RC) drilling within
    the south pit, comprising infill and extensional drilling

    • Final results from diamond drillhole CM24-16 received, increasing the
    intercept from 88m to 104.7m:

    o 104.7m @ 3.65g/t Au from 77.23m
     Incl. 12.2m @ 8.40g/t Au from 108.81m

    o 12.8m @ 2.18g/t Au from 208.17m
    • First results from the RC program have been received, with the following

    significant results:
    o RC24-003 25.9m @ 1.91g/t Au from 57.91m
     Incl. 3.05m @ 3.05g/t Au from 57.91m

    o RC24-004 3.05m @ 1.92g/t Au from 86.86m
    3.05m @ 2.95g/t Au from 94.48m

    o RC24-008 74.7m @ 4.27g/t Au from 77.72m
     Incl. 27.4m @ 7.82g/t Au from 88.39m

    • Updated Mineral Resource Estimate (MRE) underway, with an expected
    release in early June to be followed by mining studies
    Dateline Resources Limited (Dateline or the Company) is pleased to announce
    further significant gold values from drilling results at the Colosseum Gold Mine in
    California. The Company currently has a diamond and RC rig operating in the south
    pit undertaking infill and extensional drilling.

    Diamond drillhole CM24-16 was first reported in April 2024, with assays returned
    for the upper portion of the hole (88m @ 4.18g/t Au). The hole was extended to
    ensure that it finished outside of the sedimentary breccia, with recent assays
    extending the intersection to 104.7m @ 3.65g/t Au.

    The RC drill rig is focused on infill drilling and testing the margins of the existing
    Mineral Resource. Significant results received to date include 74.7m @ 4.27g/t Au
    and 25.9m @ 1.92g/t Au.

    The Mineral Resource update is currently underway. Results from CM24-16 will be
    included in this update, however the RC results will be included in a subsequent
    update later in the year.

    Commenting on the study, Managing Director, Stephen Baghdadi, stated:

    “These drill hole results are further confirmation that the Colosseum project has
    delivered consistent gold grades in a wide zone.

    “With the updated MRE expected in the next few weeks, we plan to move quickly
    to determining a mine plan to extract value for our shareholders.”

    For more info. refer to todays ann.

    glall
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.