DTR:SIGNIFICANT SULPHIDES INTERSECTED INSEDIMENTARY BRECCIA AT...

  1. 1,701 Posts.
    lightbulb Created with Sketch. 49
    DTR:

    SIGNIFICANT SULPHIDES INTERSECTED IN
    SEDIMENTARY BRECCIA AT COLOSSEUM GOLD MINE


    HIGHLIGHTS


    • Diamond drilling at Colosseum Gold Mine, California has intersected significant
    sulphides (pyrite, sphalerite, galena and minor electrum) over 133 metres.

    • Drillhole CM23-14 was drilled to test a revised geological model and expand upon
    the high-grade sedimentary breccia zone identified in CM23-08, which returned
    exceptional results of 76.2m @ 8.62g/t Au.1

    • Core has been logged, cut, and sampled with priority analysis requested. Assay
    results are expected in 3-4 weeks.

    • An updated Mineral Resource Estimate (MRE) is expected to be released during the
    March quarter reflective of the recent drilling results (including CM23-14).

    Dateline’s Managing Director, Stephen Baghdadi, commented:

    “The objective of this drill hole was to test our current understanding of the revised
    geological model and extend the known high grade sedimentary breccia zone. The
    consistency of the 133-metre-wide sedimentary breccia intersection has exceeded our
    expectations and supports our current understanding of the geological model.

    “The 133-metre intersection contains significant sulphides within the breccia matrix and
    sulphide replacement of sedimentary clasts. This drill hole has extended the sedimentary
    breccia beyond what was identified in drill hole CM23-08 (76.2m @ 8.62g/t Au) and we
    have dispatched the samples for priority analysis.”

    for more info refer to todays ann.

    glall
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.