    The coal is thermal.

    A few bits of info:
    The conceptual operation at Takatokwane Mine contemplates two open-cut strip mines employing drag line machinery each mining some 6 million tonnes per annum of coal. Some of this product will be upgraded through a modular two stage washing plant with three products delivered for despatch. These are an international seaborne coal product at a calorific value (CV) grade of 5,500 Kcal/kg, a mid-range product at around 4,800 Kcal/kg and a power station feed of 4,200 Kcal/kg.

    The economic viability of the project requires the construction of a rail line currently under investigation by the Governments of Botswana and Namibia and recovery in international benchmark thermal coal prices. For this reason and until progress is made on these fronts, the Company is not prioritising the project schedule at this time.

    • Inferred Resource of 7,000,000,000 tonnes thermal grade coal

    • Indicated Resource 748,000,000 tonnes in shallow, wide seams

    • Pre-feasibility study now on FOUR by 6,000,000 tpa strip mines

    • Mega Mine operation will supply key export and regional markets

    • Path to Market via Trans Kalahari Rail Line across the property

    • Secondary path to market via South Africa and Eskom demand

      Trans-Kalahari Rail (TKR) to Namibia
      • Botswana Government have appointed Aurecon (Aust) study manager leading to appointment of Developer and construction of project if proved viable.

      • Also appointed Synergies Economic Consulting (Aust) and Deloittes (Aust) for regulatory framework and economic, commercial and financing structure.

      • Stakeholder workshops ongoing – Botswana Coal Forum and Coal Development Unit are all active

        TKR Timing
      • Project Approval 2015

      • Project Funding 2015-16

      • Construction 2016-2020

      • Operational Start Up 2020-22

        Project Characteristics
        • Takatokwane is huge and this gives flexibility

        • The TKR railway will be passing very close to Takatokwane

        • There is strong government support for the rail-line

        • WKT can export coal in two directions when the rail-line is built

          Market Dynamics
        • The Southern African coal market will be facing price tension by 2020

        • Indonesian coal exports have peaked

        • USA shale gas is now becoming more expensive than hard coal
 