While any further mining of the open pit/pits should present no problems with the hanging wall. That is unless the pit shell has to be widened, the main problem will be once underground mining takes place. An inherent weak hanging wall can & will deplete the mined nickel grade & of course increase costs of extraction, at times by a very big margin. I do not doubt the expertise of management, but i would encourage an inspection of all diamond drill core & by that i mean the full length of the core, not just the suphides by suitable qualified geologists & rock engineers. As i said in my previous post, there are ways to mitigate any dilution, but that means thinking outside of the box of any normal mining operation. GLTA.
- Forums
- ASX - By Stock
- Widge nickel discoveries.
While any further mining of the open pit/pits should present no...
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WIN (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.9¢ |
Change
-0.001(2.50%) |
Mkt cap ! $11.62M |
Open | High | Low | Value | Volume |
3.8¢ | 4.0¢ | 3.8¢ | $7.23K | 188.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 344323 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 311498 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 344323 | 0.038 |
3 | 151445 | 0.037 |
5 | 173333 | 0.036 |
1 | 150000 | 0.035 |
3 | 154710 | 0.034 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 311498 | 3 |
0.042 | 60600 | 1 |
0.044 | 50000 | 1 |
0.048 | 14200 | 1 |
0.049 | 50000 | 1 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
3.8¢ |
  |
Change
-0.001 ( 5.00 %) |
|||
Open | High | Low | Volume | ||
3.8¢ | 3.8¢ | 3.8¢ | 10001 | ||
Last updated 15.59pm 03/05/2024 ? |
Featured News
WIN (ASX) Chart |