• Viewed 10,240 times by 3014 users (Last 30 days)
  • print Created with Sketch. Print
MEP

MINOTAUR EXPLORATION LTD - Announcements

0.00% ! 20.5¢
Currently unlisted.

Minotaur Exploration Limited (Minotaur) is an Australia-based company that engaged in... Minotaur Exploration Limited (Minotaur) is an Australia-based company that engaged in securing new tenements with potential for the mineralization and evaluating results achieved through surface sampling, drilling, and geophysical surveys. Minotaur’s projects include Pyramid Gold, Breena Plains Joint Venture (JV), Eloise project, Jericho project, and Great White project. The Pyramid Gold project is located 180 kilometers south of Townsville and covering 150 kilometers square embraces two main areas prospective for gold, being the West Pyramid Range and East Pyramid Range. The Breena Plains JV provides regional scope for Minotaur to locate prospects proximal to Jericho, for assessment. The Eloise project is a joint operation between OZ Minerals Ltd owning 70% and the Minotaur owning 30%. The Jericho project is a joint operation between OZ Minerals Ltd and the Minotaur. The Great White project is a joint operation between Andromeda Metals Ltd owning 51% and the Minotaur owning 49%.More

Announcements



MEP Drilling resumes at Jericho copper discovery for Eloise JV04/04/19 download Created with Sketch. 11.66MB
MEP Change of Director's Interest Notice - Dr Higgins22/03/19 download Created with Sketch. 231.08KB
MEP Change of Director's Interest Notice - Dr Higgins25/02/19 download Created with Sketch. 227.88KB
MEP Half Year Accounts - 31 December 2018PRICE SENSITIVE15/02/19 download Created with Sketch. 9.01MB
MEP Quarterly Activities ReportPRICE SENSITIVE30/01/19 download Created with Sketch. 13.17MB
MEP Quarterly Cashflow ReportPRICE SENSITIVE14/01/19 download Created with Sketch. 348.58KB
MEP Change in substantial holding08/01/19 download Created with Sketch. 256.77KB
MEP Change of Director's Interest Notice - Mr McKenzie31/12/18 download Created with Sketch. 228.34KB
MEP Change of Director's Interest Notice - Mr McKenzie24/12/18 download Created with Sketch. 228.56KB
MEP Change of Director's Interest Notice - Dr Higgins21/12/18 download Created with Sketch. 229KB
MEP Eloise JV steps up for stellar 2019 field seasonPRICE SENSITIVE18/12/18 download Created with Sketch. 3.91MB
MEP Appendix 3B14/12/18 download Created with Sketch. 572.98KB
MEP CEI grant recognises Highlands copper potential, NW QLDPRICE SENSITIVE06/12/18 download Created with Sketch. 3.55MB
MEP Results of Annual General Meeting 201828/11/18 download Created with Sketch. 313.63KB
MEP AGM Presentation 201828/11/18 download Created with Sketch. 3.86MB
MEP Chairman's Address to Shareholders28/11/18 download Created with Sketch. 517.82KB
MEP Appendix 3B23/11/18 download Created with Sketch. 807.32KB
MEP Change of Director's Interest Notice - Dr Belperio16/11/18 download Created with Sketch. 232.03KB
MEP Appendix 3B16/11/18 download Created with Sketch. 573.47KB
MEP Minotaur closes Share Purchase Plan and completes shortfall16/11/18 download Created with Sketch. 310.38KB
MEP AMENDED FIGURES - Eloise JV continues to drill into Jericho07/11/18 download Created with Sketch. 3.44MB
MEP Eloise JV continues to drill into Jericho copper discoveryPRICE SENSITIVE07/11/18 download Created with Sketch. 3.1MB
MEP Share Purchase Plan Closing Date Extended01/11/18 download Created with Sketch. 258.76KB
MEP Corporate Governance Statement26/10/18 download Created with Sketch. 118.56KB
MEP Appendix 4G26/10/18 download Created with Sketch. 184.01KB
MEP 2018 Annual Report26/10/18 download Created with Sketch. 8.91MB
MEP Notice of Annual General Meeting/Proxy Form26/10/18 download Created with Sketch. 298.15KB
MEP Shallow high grade copper zones (with JORC table attached)25/10/18 download Created with Sketch. 3.92MB
MEP Shallow high grade copper zones in Jericho, Eloise JVPRICE SENSITIVE25/10/18 download Created with Sketch. 2.85MB
MEP Drilling underway at Highlands Cu project, Mt Isa23/10/18 download Created with Sketch. 4.45MB
MEP Share Purchase Plan22/10/18 download Created with Sketch. 976.97KB
MEP Cleansing Notice22/10/18 download Created with Sketch. 225KB
MEP Quarterly Cashflow ReportPRICE SENSITIVE19/10/18 download Created with Sketch. 351.31KB
MEP SPP Presentation17/10/18 download Created with Sketch. 5.16MB
MEP Minotaur announces SPP to advance explorationPRICE SENSITIVE16/10/18 download Created with Sketch. 593.54KB
MEP Minotaur enters base metals JV near Thalanga, QueenslandPRICE SENSITIVE15/10/18 download Created with Sketch. 3.13MB
MEP Jericho delivers more Copper results for Eloise JVPRICE SENSITIVE09/10/18 download Created with Sketch. 3.51MB
MEP Drilling underway for Osborne JV, CloncurryPRICE SENSITIVE04/10/18 download Created with Sketch. 8.74MB
MEP Quarterly Activities ReportPRICE SENSITIVE03/10/18 download Created with Sketch. 7.02MB
MEP Positive drill targets at Highlands Cu project, Mt IsaPRICE SENSITIVE06/09/18 download Created with Sketch. 11.24MB
MEP OZ Minerals raises Eloise JV investment and expands activityPRICE SENSITIVE04/09/18 download Created with Sketch. 2.51MB
MEP Full Year Statutory Accounts - 30 June 201828/08/18 download Created with Sketch. 1.96MB
MEP Drilling update for Jericho copper prospect at Eloise JVPRICE SENSITIVE28/08/18 download Created with Sketch. 9.15MB
MEP Shareholder Presentation06/08/18 download Created with Sketch. 16.72MB
MEP Drilling probes Jericho copper depth extensions for EloisePRICE SENSITIVE06/08/18 download Created with Sketch. 7.62MB
MEP Section 708A Notice and Appendix 3B27/07/18 download Created with Sketch. 806.83KB
MEP Quarterly Report Period Ended 30 June 2018PRICE SENSITIVE27/07/18 download Created with Sketch. 8.49MB
MEP Field work initiated at Highlands Cu project, Mt IsaPRICE SENSITIVE23/07/18 download Created with Sketch. 8.71MB
MEP SMD: Syndicated Completes Sale of Northern Hub to MinotaurPRICE SENSITIVE23/07/18 download Created with Sketch. 153.91KB
MEP Drilling campaign expanded along Jericho copper systemPRICE SENSITIVE20/07/18 download Created with Sketch. 2.83MB
MEP Termination of Sale of Leinster tenements, WAPRICE SENSITIVE17/07/18 download Created with Sketch. 211.08KB
MEP Appendix 5B - June 2018PRICE SENSITIVE06/07/18 download Created with Sketch. 349.35KB
MEP Change in substantial holding for TMZ05/07/18 download Created with Sketch. 970.12KB
MEP ADN: High Chinese demand for Carey's Well halloysite-kaolinPRICE SENSITIVE25/06/18 download Created with Sketch. 1.63MB
MEP Expansive copper-gold system proven at 'Jericho'PRICE SENSITIVE14/06/18 download Created with Sketch. 6.12MB
MEP ADN:Initial HPA results confirm 99% 4N potential at PoocheraPRICE SENSITIVE30/05/18 download Created with Sketch. 1.18MB
MEP SMD: Sells Northern Hub Copper Tenements in Queensland23/05/18 download Created with Sketch. 155.3KB
MEP Minotaur acquires Cu prospects near Mt IsaPRICE SENSITIVE23/05/18 download Created with Sketch. 5.57MB
MEP EM extends conductors at Saints nickel-cobalt projectPRICE SENSITIVE22/05/18 download Created with Sketch. 5.81MB
MEP Drilling progresses at Eloise JV, CloncurryPRICE SENSITIVE11/05/18 download Created with Sketch. 2.98MB
MEP Change of Registered Office08/05/18 download Created with Sketch. 268.42KB
MEP Quarterly ReportPRICE SENSITIVE30/04/18 download Created with Sketch. 5.33MB
MEP Strategic farm-out to advance kaolin-halloysite assetsPRICE SENSITIVE26/04/18 download Created with Sketch. 3.03MB
MEP ADN: Andromeda Metals to enter HPA sector and manage.changesPRICE SENSITIVE26/04/18 download Created with Sketch. 1.06MB
MEP MEP Corporate Governance Statement20/04/18 download Created with Sketch. 118.9KB
MEP Minotaur Investment Highlights16/04/18 download Created with Sketch. 12.09MB
MEP Minotaur sells Leinster tenements, WAPRICE SENSITIVE16/04/18 download Created with Sketch. 2.4MB
MEP ADN: $5 million Joint Venture to reinvigorate Rover ProjectPRICE SENSITIVE16/04/18 download Created with Sketch. 286.68KB
MEP Minotaur farms-in to Rover Cu-Au Project, Tennant CreekPRICE SENSITIVE16/04/18 download Created with Sketch. 1.51MB
MEP Drilling resumes at Eloise JV, CloncurryPRICE SENSITIVE11/04/18 download Created with Sketch. 1.88MB
MEP Appendix 5B - March 2018PRICE SENSITIVE10/04/18 download Created with Sketch. 1018.51KB
MEP Infill EM survey underway at Eloise JV, CloncurryPRICE SENSITIVE29/03/18 download Created with Sketch. 1.56MB
MEP EM survey underway at Saints nickel-cobalt project26/03/18 download Created with Sketch. 1.95MB
MEP Eloise JV Gears UpPRICE SENSITIVE21/02/18 download Created with Sketch. 1.05MB
MEP Half Year Accounts - 31 December 201720/02/18 download Created with Sketch. 719.82KB
MEP Alliance Activity ConcludesPRICE SENSITIVE08/02/18 download Created with Sketch. 1.05MB
MEP Quarterly Report Period Ended 31 December 2017PRICE SENSITIVE25/01/18 download Created with Sketch. 12.27MB
MEP Copper-gold assays establish discovery potential at JerichoPRICE SENSITIVE24/01/18 download Created with Sketch. 5.64MB
MEP Appendix 5BPRICE SENSITIVE11/01/18 download Created with Sketch. 355.96KB
MEP Non core asset sales completed20/12/17 download Created with Sketch. 849.4KB
MEP QLD Government recognises Minotaur through CEI grantPRICE SENSITIVE18/12/17 download Created with Sketch. 1.1MB
MEP Copper sulphides intersected at Maverick, South AustraliaPRICE SENSITIVE15/12/17 download Created with Sketch. 2.53MB
MEP Assays confirm wide Jericho copper-gold zonesPRICE SENSITIVE11/12/17 download Created with Sketch. 4.45MB
MEP Appendix 3Y08/12/17 download Created with Sketch. 228.27KB
MEP Appendix 3Y08/12/17 download Created with Sketch. 231.76KB
MEP Appendix 3B08/12/17 download Created with Sketch. 574.98KB
MEP Results of 2017 Annual General Meeting30/11/17 download Created with Sketch. 317.08KB
MEP AGM Presentation 201730/11/17 download Created with Sketch. 18.06MB
MEP Chairman's Address, Annual General Meeting30/11/17 download Created with Sketch. 438.25KB
MEP Multiple copper intersections at 'Jericho', Eloise JVPRICE SENSITIVE24/11/17 download Created with Sketch. 4.33MB
MEP Drilling underway near Prominent Hill mine -Footnote revised20/11/17 download Created with Sketch. 1.25MB
MEP Drilling underway near Prominent Hill minePRICE SENSITIVE20/11/17 download Created with Sketch. 1.25MB
MEP High grade copper-gold confirmed at 'Jericho', Eloise JVPRICE SENSITIVE03/11/17 download Created with Sketch. 5.54MB
MEP Imminent Expiry of Options31/10/17 download Created with Sketch. 3.03MB
MEP Appendix 3B27/10/17 download Created with Sketch. 575.57KB
MEP Proxy Form27/10/17 download Created with Sketch. 88.25KB
MEP Appendix 4G27/10/17 download Created with Sketch. 195.51KB
MEP Annual Report27/10/17 download Created with Sketch. 3.06MB
MEP Notice of Annual General Meeting27/10/17 download Created with Sketch. 751.17KB
MEP Quarterly Report and Appendix 5B to 30 September 2017PRICE SENSITIVE26/10/17 download Created with Sketch. 4.39MB
MEP Drilling resumes at Jericho copper discovery for Eloise JV
04/04/19 download Created with Sketch. 11.66MB
MEP Change of Director's Interest Notice - Dr Higgins
22/03/19 download Created with Sketch. 231.08KB
MEP Change of Director's Interest Notice - Dr Higgins
25/02/19 download Created with Sketch. 227.88KB
MEP Half Year Accounts - 31 December 2018
15/02/19PRICE SENSITIVE download Created with Sketch. 9.01MB
MEP Quarterly Activities Report
30/01/19PRICE SENSITIVE download Created with Sketch. 13.17MB
MEP Quarterly Cashflow Report
14/01/19PRICE SENSITIVE download Created with Sketch. 348.58KB
MEP Change in substantial holding
08/01/19 download Created with Sketch. 256.77KB
MEP Change of Director's Interest Notice - Mr McKenzie
31/12/18 download Created with Sketch. 228.34KB
MEP Change of Director's Interest Notice - Mr McKenzie
24/12/18 download Created with Sketch. 228.56KB
MEP Change of Director's Interest Notice - Dr Higgins
21/12/18 download Created with Sketch. 229KB
MEP Eloise JV steps up for stellar 2019 field season
18/12/18PRICE SENSITIVE download Created with Sketch. 3.91MB
MEP Appendix 3B
14/12/18 download Created with Sketch. 572.98KB
MEP CEI grant recognises Highlands copper potential, NW QLD
06/12/18PRICE SENSITIVE download Created with Sketch. 3.55MB
MEP Results of Annual General Meeting 2018
28/11/18 download Created with Sketch. 313.63KB
MEP AGM Presentation 2018
28/11/18 download Created with Sketch. 3.86MB
MEP Chairman's Address to Shareholders
28/11/18 download Created with Sketch. 517.82KB
MEP Appendix 3B
23/11/18 download Created with Sketch. 807.32KB
MEP Change of Director's Interest Notice - Dr Belperio
16/11/18 download Created with Sketch. 232.03KB
MEP Appendix 3B
16/11/18 download Created with Sketch. 573.47KB
MEP Minotaur closes Share Purchase Plan and completes shortfall
16/11/18 download Created with Sketch. 310.38KB
MEP AMENDED FIGURES - Eloise JV continues to drill into Jericho
07/11/18 download Created with Sketch. 3.44MB
MEP Eloise JV continues to drill into Jericho copper discovery
07/11/18PRICE SENSITIVE download Created with Sketch. 3.1MB
MEP Share Purchase Plan Closing Date Extended
01/11/18 download Created with Sketch. 258.76KB
MEP Corporate Governance Statement
26/10/18 download Created with Sketch. 118.56KB
MEP Appendix 4G
26/10/18 download Created with Sketch. 184.01KB
MEP 2018 Annual Report
26/10/18 download Created with Sketch. 8.91MB
MEP Notice of Annual General Meeting/Proxy Form
26/10/18 download Created with Sketch. 298.15KB
MEP Shallow high grade copper zones (with JORC table attached)
25/10/18 download Created with Sketch. 3.92MB
MEP Shallow high grade copper zones in Jericho, Eloise JV
25/10/18PRICE SENSITIVE download Created with Sketch. 2.85MB
MEP Drilling underway at Highlands Cu project, Mt Isa
23/10/18 download Created with Sketch. 4.45MB
MEP Share Purchase Plan
22/10/18 download Created with Sketch. 976.97KB
MEP Cleansing Notice
22/10/18 download Created with Sketch. 225KB
MEP Quarterly Cashflow Report
19/10/18PRICE SENSITIVE download Created with Sketch. 351.31KB
MEP SPP Presentation
17/10/18 download Created with Sketch. 5.16MB
MEP Minotaur announces SPP to advance exploration
16/10/18PRICE SENSITIVE download Created with Sketch. 593.54KB
MEP Minotaur enters base metals JV near Thalanga, Queensland
15/10/18PRICE SENSITIVE download Created with Sketch. 3.13MB
MEP Jericho delivers more Copper results for Eloise JV
09/10/18PRICE SENSITIVE download Created with Sketch. 3.51MB
MEP Drilling underway for Osborne JV, Cloncurry
04/10/18PRICE SENSITIVE download Created with Sketch. 8.74MB
MEP Quarterly Activities Report
03/10/18PRICE SENSITIVE download Created with Sketch. 7.02MB
MEP Positive drill targets at Highlands Cu project, Mt Isa
06/09/18PRICE SENSITIVE download Created with Sketch. 11.24MB
MEP OZ Minerals raises Eloise JV investment and expands activity
04/09/18PRICE SENSITIVE download Created with Sketch. 2.51MB
MEP Full Year Statutory Accounts - 30 June 2018
28/08/18 download Created with Sketch. 1.96MB
MEP Drilling update for Jericho copper prospect at Eloise JV
28/08/18PRICE SENSITIVE download Created with Sketch. 9.15MB
MEP Shareholder Presentation
06/08/18 download Created with Sketch. 16.72MB
MEP Drilling probes Jericho copper depth extensions for Eloise
06/08/18PRICE SENSITIVE download Created with Sketch. 7.62MB
MEP Section 708A Notice and Appendix 3B
27/07/18 download Created with Sketch. 806.83KB
MEP Quarterly Report Period Ended 30 June 2018
27/07/18PRICE SENSITIVE download Created with Sketch. 8.49MB
MEP Field work initiated at Highlands Cu project, Mt Isa
23/07/18PRICE SENSITIVE download Created with Sketch. 8.71MB
MEP SMD: Syndicated Completes Sale of Northern Hub to Minotaur
23/07/18PRICE SENSITIVE download Created with Sketch. 153.91KB
MEP Drilling campaign expanded along Jericho copper system
20/07/18PRICE SENSITIVE download Created with Sketch. 2.83MB
MEP Termination of Sale of Leinster tenements, WA
17/07/18PRICE SENSITIVE download Created with Sketch. 211.08KB
MEP Appendix 5B - June 2018
06/07/18PRICE SENSITIVE download Created with Sketch. 349.35KB
MEP Change in substantial holding for TMZ
05/07/18 download Created with Sketch. 970.12KB
MEP ADN: High Chinese demand for Carey's Well halloysite-kaolin
25/06/18PRICE SENSITIVE download Created with Sketch. 1.63MB
MEP Expansive copper-gold system proven at 'Jericho'
14/06/18PRICE SENSITIVE download Created with Sketch. 6.12MB
MEP ADN:Initial HPA results confirm 99% 4N potential at Poochera
30/05/18PRICE SENSITIVE download Created with Sketch. 1.18MB
MEP SMD: Sells Northern Hub Copper Tenements in Queensland
23/05/18 download Created with Sketch. 155.3KB
MEP Minotaur acquires Cu prospects near Mt Isa
23/05/18PRICE SENSITIVE download Created with Sketch. 5.57MB
MEP EM extends conductors at Saints nickel-cobalt project
22/05/18PRICE SENSITIVE download Created with Sketch. 5.81MB
MEP Drilling progresses at Eloise JV, Cloncurry
11/05/18PRICE SENSITIVE download Created with Sketch. 2.98MB
MEP Change of Registered Office
08/05/18 download Created with Sketch. 268.42KB
MEP Quarterly Report
30/04/18PRICE SENSITIVE download Created with Sketch. 5.33MB
MEP Strategic farm-out to advance kaolin-halloysite assets
26/04/18PRICE SENSITIVE download Created with Sketch. 3.03MB
MEP ADN: Andromeda Metals to enter HPA sector and manage.changes
26/04/18PRICE SENSITIVE download Created with Sketch. 1.06MB
MEP MEP Corporate Governance Statement
20/04/18 download Created with Sketch. 118.9KB
MEP Minotaur Investment Highlights
16/04/18 download Created with Sketch. 12.09MB
MEP Minotaur sells Leinster tenements, WA
16/04/18PRICE SENSITIVE download Created with Sketch. 2.4MB
MEP ADN: $5 million Joint Venture to reinvigorate Rover Project
16/04/18PRICE SENSITIVE download Created with Sketch. 286.68KB
MEP Minotaur farms-in to Rover Cu-Au Project, Tennant Creek
16/04/18PRICE SENSITIVE download Created with Sketch. 1.51MB
MEP Drilling resumes at Eloise JV, Cloncurry
11/04/18PRICE SENSITIVE download Created with Sketch. 1.88MB
MEP Appendix 5B - March 2018
10/04/18PRICE SENSITIVE download Created with Sketch. 1018.51KB
MEP Infill EM survey underway at Eloise JV, Cloncurry
29/03/18PRICE SENSITIVE download Created with Sketch. 1.56MB
MEP EM survey underway at Saints nickel-cobalt project
26/03/18 download Created with Sketch. 1.95MB
MEP Eloise JV Gears Up
21/02/18PRICE SENSITIVE download Created with Sketch. 1.05MB
MEP Half Year Accounts - 31 December 2017
20/02/18 download Created with Sketch. 719.82KB
MEP Alliance Activity Concludes
08/02/18PRICE SENSITIVE download Created with Sketch. 1.05MB
MEP Quarterly Report Period Ended 31 December 2017
25/01/18PRICE SENSITIVE download Created with Sketch. 12.27MB
MEP Copper-gold assays establish discovery potential at Jericho
24/01/18PRICE SENSITIVE download Created with Sketch. 5.64MB
MEP Appendix 5B
11/01/18PRICE SENSITIVE download Created with Sketch. 355.96KB
MEP Non core asset sales completed
20/12/17 download Created with Sketch. 849.4KB
MEP QLD Government recognises Minotaur through CEI grant
18/12/17PRICE SENSITIVE download Created with Sketch. 1.1MB
MEP Copper sulphides intersected at Maverick, South Australia
15/12/17PRICE SENSITIVE download Created with Sketch. 2.53MB
MEP Assays confirm wide Jericho copper-gold zones
11/12/17PRICE SENSITIVE download Created with Sketch. 4.45MB
MEP Appendix 3Y
08/12/17 download Created with Sketch. 228.27KB
MEP Appendix 3Y
08/12/17 download Created with Sketch. 231.76KB
MEP Appendix 3B
08/12/17 download Created with Sketch. 574.98KB
MEP Results of 2017 Annual General Meeting
30/11/17 download Created with Sketch. 317.08KB
MEP AGM Presentation 2017
30/11/17 download Created with Sketch. 18.06MB
MEP Chairman's Address, Annual General Meeting
30/11/17 download Created with Sketch. 438.25KB
MEP Multiple copper intersections at 'Jericho', Eloise JV
24/11/17PRICE SENSITIVE download Created with Sketch. 4.33MB
MEP Drilling underway near Prominent Hill mine -Footnote revised
20/11/17 download Created with Sketch. 1.25MB
MEP Drilling underway near Prominent Hill mine
20/11/17PRICE SENSITIVE download Created with Sketch. 1.25MB
MEP High grade copper-gold confirmed at 'Jericho', Eloise JV
03/11/17PRICE SENSITIVE download Created with Sketch. 5.54MB
MEP Imminent Expiry of Options
31/10/17 download Created with Sketch. 3.03MB
MEP Appendix 3B
27/10/17 download Created with Sketch. 575.57KB
MEP Proxy Form
27/10/17 download Created with Sketch. 88.25KB
MEP Appendix 4G
27/10/17 download Created with Sketch. 195.51KB
MEP Annual Report
27/10/17 download Created with Sketch. 3.06MB
MEP Notice of Annual General Meeting
27/10/17 download Created with Sketch. 751.17KB
MEP Quarterly Report and Appendix 5B to 30 September 2017
26/10/17PRICE SENSITIVE download Created with Sketch. 4.39MB
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
Add to My Watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.