If the units were turned on in April to receive subsidies from that point on , then we can assume final invoicing is in April. Its possible an upfront deposit was required and therefore will be reflected in the next quarterly.
191 now installed, although the generated Kw gives an average of less than 1 Kw. I think it was mentioned the site previously reflected units running at any given time, but now reflects those units installed. Initial run up time from switch on to operating capacity is about 24 hrs, which may cause a temporary lag in the generation capacity relative to the number of units installed.
CFU Price at posting:
9.8¢ Sentiment: Buy Disclosure: Held