KAR 0.00% $1.38 karoon energy ltd

montara sands, page-2

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Dont know abt that. Keep an eye for any mention once they get past 4650m, they'll get a good idea once they run wireline logs.

    Possibilities are as under:

    1) MS may b thinnish or just absent at B#1.

    2) MS came in around 4714m at P#2, so depending on the structure they r drilling it may b around the same depth, if the sand blanket is present.

    3) If MS not present, then COP will set the 7" liner & drill onwards to first target of Plover A.

    For now, nxt pitstop should b apprx at 4050-4100m for the 9" casing.
 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.