Dec quarterly report this hole was at the lab, 3 months later is is under Qa/Qc. Someone somewhere is getting paid a lot to do not a lot. At this rate, the results from the 10000m drill of Pedra Branca might be known in 2020...if we are lucky.
This is totally unacceptable. The company needs to whip some people into action.
- Forums
- ASX - By Stock
- AVB
- aand48 -- 3 months at labs and qa
aand48 -- 3 months at labs and qa
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)