glava, Their plan is to drill 3 vertical wells frac the producing zones. Assess the best of the 3 wells and drill a 1km horizontal, fracc that and go into production .This will take till years end to achieve so best we all be patient.They currently have Taylor Sands on test I believe and we should know the results of that test very soon. then there will be the long term test of the oil found in the Eagle Ford. Sorry guys you DTs will have to wait or take a bath. Us LT investors are still very happy to know that our companies long term plans are being put in place as we speak. DYOR and you DTs may well be convinced to become longtermers.
AKK Price at posting:
2.8¢ Sentiment: LT Buy Disclosure: Held