THICKEST COAL SEAM INTERCEPTS TO DATE
ASX Announcement
8 May 2012
DRAIG COMPLETES TEEG DRILL PROGRAM WITH
THICKEST COAL SEAM INTERCEPTS TO DATE
Highlights
• Coal seam intersected with apparent seam thickness of 86.28m (BT_37)
• Seam was continually intersected over range of 27m to 146m depth
• Twin cored angle hole with 30m selected intercepts at < 82m (BT_37C)
• Coal quality testing underway
• Phase 1 drill program complete with over 6000m, Phase 2 planning underway
• Mongolian Office established - General Manager appointed
Draig Resources Limited (ASX: DRG) (“Draig” or “the Company”) is pleased to announce it has
intercepted a coal seam with apparent coal thickness of 86.28m in drill hole BT_37 during exploration
on its Teeg licence in Mongolia’s Ovorhangay province.
The seam, which was intersected over a depth of 27m to 146m, was the thickest coal seam logged by
Draig during its Phase 1 exploration program on Teeg. The second thickest intercept recorded during
the Phase 1 drill program on Teeg was on BT_36, with a cumulative thickness of 66.75m.
In addition, a twin angled cored hole intercepted 30m thick coal seam intercepts at < 82m.
Draig’s extended Phase 1 drill program has now been completed. A total of just over 6000m was
drilled, with multiple shallow coal seam intersections logged on a total of 16 holes at less than 175m
depth over a 3.5km strike length.
Three holes have been completed, adjacent to drill holes BT_37, BT_24 and BT_38 which were drilled
to core representative coal intervals for quality and petrographic testing. Drill hole BT_37C selectively
cored coal seams intercepts of 30m of coal at < 82m and BT_24C selectively intercepted 13m at <87m.The logging results on BT_7, BT_38 and BT_38C are still to be finalised
ASX Announcement
8 May 2012
DRAIG COMPLETES TEEG DRILL PROGRAM WITH
THICKEST COAL SEAM INTERCEPTS TO DATE
Highlights
• Coal seam intersected with apparent seam thickness of 86.28m (BT_37)
• Seam was continually intersected over range of 27m to 146m depth
• Twin cored angle hole with 30m selected intercepts at < 82m (BT_37C)
• Coal quality testing underway
• Phase 1 drill program complete with over 6000m, Phase 2 planning underway
• Mongolian Office established - General Manager appointed
Draig Resources Limited (ASX: DRG) (“Draig” or “the Company”) is pleased to announce it has
intercepted a coal seam with apparent coal thickness of 86.28m in drill hole BT_37 during exploration
on its Teeg licence in Mongolia’s Ovorhangay province.
The seam, which was intersected over a depth of 27m to 146m, was the thickest coal seam logged by
Draig during its Phase 1 exploration program on Teeg. The second thickest intercept recorded during
the Phase 1 drill program on Teeg was on BT_36, with a cumulative thickness of 66.75m.
In addition, a twin angled cored hole intercepted 30m thick coal seam intercepts at < 82m.
Draig’s extended Phase 1 drill program has now been completed. A total of just over 6000m was
drilled, with multiple shallow coal seam intersections logged on a total of 16 holes at less than 175m
depth over a 3.5km strike length.
Three holes have been completed, adjacent to drill holes BT_37, BT_24 and BT_38 which were drilled
to core representative coal intervals for quality and petrographic testing. Drill hole BT_37C selectively
cored coal seams intercepts of 30m of coal at < 82m and BT_24C selectively intercepted 13m at <87m.The logging results on BT_7, BT_38 and BT_38C are still to be finalised
- Forums
- ASX - By Stock
- BGL
- draig completes teeg drill program
draig completes teeg drill program
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BGL (ASX) to my watchlist
|
|||||
Last
$1.82 |
Change
-0.030(1.63%) |
Mkt cap ! $2.136B |
Open | High | Low | Value | Volume |
$1.83 | $1.84 | $1.80 | $5.169M | 2.845M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 56503 | $1.82 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.82 | 6164 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5518 | 1.810 |
1 | 6000 | 1.805 |
3 | 26699 | 1.800 |
2 | 7038 | 1.795 |
2 | 10588 | 1.790 |
Price($) | Vol. | No. |
---|---|---|
1.820 | 5588 | 1 |
1.825 | 5588 | 1 |
1.830 | 5588 | 1 |
1.835 | 5588 | 1 |
1.840 | 12513 | 2 |
Last trade - 16.10pm 19/07/2024 (20 minute delay) ? |
Featured News
BGL (ASX) Chart |