re: Ann: Processing Plant Design Finalised fo... My mate just got back to me. I asked about the 3-4 months.
"man by the looks of it it is quite a large job with loads of control wiring, I would be surprised it could be done in 3 to 4 months in total, let alone but **** Africa?
You can do with that as you will.
- Forums
- ASX - By Stock
- KAB
- Ann: Processing Plant Design Finalised for Emmanu
Ann: Processing Plant Design Finalised for Emmanu, page-65
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)