ENV 10.0% 0.9¢ enova mining limited

race to the finish line, page-29

  1. 3,237 Posts.
    Stoops,

    I found this concept paper on rare earth element specially for you:-

    http://www.c-tempo.org/studies/Rare_Earth_paper.pdf

    Please pay particular note commencing on page 5. Steps for Extraction of rare elements


    And here is another good article for you called The Rare Earth Supply Chain: Ores, Concentrates, Compounds, Oxides and Metals:-

    http://www.altenergystocks.com/archives/2011/05/the_rare_earth_supply_chain_ores_concentrates_compounds_oxides_and_metals.html


    So hopefully you can now see that producing a concentrate is a:-

    "milling process (which) produces a concentrate of RE minerals, which usually contains five or more times the original RE concentration in the mined ore"

    Stoops the key phrase is:-

    usually contains five or more times the "original" RE concentration in the mined ore

    ++++++++++++++++++++++

    Just in case you still don't understand, it means this:-

    if you started out with 56% light rare earths in your original ore, by the time you produce a concentrate you will still end up with 56% light rare earths in your concentrate

    The porportions don't change


    And that is why you are incorrect when you say:-

    "the presented material to a chemical seperation plant will be of very high grade "


    The % of each rare earth element will not change from the original ore, sure there is 5 or more times the rare earths in a concentrate, but the % of each rare earth element in that concentrate will be the same as the original ore


    In the case of CUX, if you started out with LOW GRADE ore, you will still have LOW GRADE concentrate

 
watchlist Created with Sketch. Add ENV (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $9.849M
Open High Low Value Volume
0.9¢ 1.0¢ 0.9¢ $10.90K 1.194M

Buyers (Bids)

No. Vol. Price($)
19 3743323 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 1650686 5
View Market Depth
Last trade - 16.10pm 17/09/2024 (20 minute delay) ?
ENV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.