Hi Stoops,
Due to my error in calculation of the head grade of the alluvium, my ore in ground value becomes $12 to $15 a tonne instead of $120 to $150. However CUX values their TREO at $US47/kg. At 0.02% REO grade this values a tonne of ore, on their own figures, at $US9.80. If you're only going to recovery 70% of it then your earnings, at maximum, for that ore becomes $US6.86. If we take their $100/kg figure this calculation becomes $14. Again, I haven't included the Zircon, which makes everything look better obviously.
At $2/tonne to mine then that's a lot of your sale price gone before you've even done anything to your ore.
A 20MTPA HMS plant isn't very mobile either.
Sorry Stoops, but I'm a non-believer.
- Forums
- ASX - By Stock
- ENV
- race to the finish line
race to the finish line, page-48
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ENV (ASX) to my watchlist
|
|||||
Last
1.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.53M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 1.1¢ | $8.846K | 804.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 2724404 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 909090 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 2724404 | 0.010 |
10 | 1991444 | 0.009 |
6 | 3748500 | 0.008 |
6 | 1607857 | 0.007 |
3 | 1266666 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 909090 | 1 |
0.012 | 2219200 | 7 |
0.013 | 5977210 | 7 |
0.014 | 1406099 | 5 |
0.015 | 2182210 | 8 |
Last trade - 12.45pm 12/07/2024 (20 minute delay) ? |
Featured News
RNU
Renascor wins a funding boost given it wants to produce a critical mineral – but $5M award pales in comparison to some
FWD
Queensland's housing crisis an opportunity for ASX builder Fleetwood – and taxpayer cash a safe harbour from the storm
ENV (ASX) Chart |