I would have thought it easier/cheaper to transport the ore to the bay in open tray trucks/trailers... with the containers then being filled from the bay stockpile. That would reduce the container numbers dramatically, but may make the truck systems more complex. Or was the bay stockpile meant to stockpile containers????
Also, most processing plants require maintenance downtime windows of opportunity and we are unsure of the stability of the power supply/generator system that is onsite. The allowances I put in were very generous for both individual streams and total plant. What I just wanted to check was if the proposal was feasible logistically or not... and yes, to me it looks like it is, we just dont know the costs involved.
- Forums
- ASX - By Stock
- TYX
- stage 1a ??
stage 1a ?? , page-17
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TYX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
-0.001(16.7%) |
Mkt cap ! $16.43M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.5¢ | $14.47K | 2.832M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 11025919 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 2280931 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 10975919 | 0.005 |
8 | 3075199 | 0.004 |
3 | 1648888 | 0.003 |
5 | 2957550 | 0.002 |
2 | 3888888 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 1648431 | 3 |
0.007 | 3722162 | 5 |
0.008 | 4334806 | 9 |
0.009 | 8329262 | 14 |
0.010 | 2108720 | 8 |
Last trade - 14.59pm 26/07/2024 (20 minute delay) ? |
Featured News
TYX (ASX) Chart |