CPL 0.00% 2.2¢ csl finance plc

coalspur projects, page-2

  1. 1,858 Posts.
    "The coal processing plant consists of two identical 1,500tph modules which have been designed
    for an average 55% yield on 20.4Mtpa ROM production utilizing 6,800 actual operating hours or at
    78% net effective utilization."

    This has been increased to 12 mill p/a since the BFS due to increased effective utilization to 83.6%
 
watchlist Created with Sketch. Add CPL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.