"The coal processing plant consists of two identical 1,500tph modules which have been designed
for an average 55% yield on 20.4Mtpa ROM production utilizing 6,800 actual operating hours or at
78% net effective utilization."
This has been increased to 12 mill p/a since the BFS due to increased effective utilization to 83.6%
- Forums
- ASX - By Stock
- CPL
- coalspur projects
coalspur projects, page-2
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CPL (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.33M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |