It is always best to read the full text of the release.
MAD has proposed drilling with their own rigs 100 low impact wells [say 20 - 30 bopd] and 50+ high impact wells down to 10,000 feet. the deeper portion of some of these wells [around 6 or so] down to 16,000 feet is beyond the capacity of MAD drill rigs and will be contracted out.
Oh and to answer your query - you are wrong.
- Forums
- ASX - By Stock
- FDM
- trading halt for share placement
trading halt for share placement, page-41
-
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
IGO
IGO kicks off earn-in copper drilling on-site Encounter's Yeneena play as it adopts new identity
MND
Monadelphous inks $200M contract with Woodside to help build Pluto LNG – but will it make Scarborough cheaper?