JID i came to the same dilemma mate, they we're however talking up the plant's capacity circa 3,000t/day. Once they excavate the silt and get enough stockpile we'll be in a much better position.
I expect from September the company should be able to ramp up its production and run the plant continuously.
I dream of a bright Christmas :)
- Forums
- ASX - By Stock
- RED
- still on track with production guidance
still on track with production guidance, page-22
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)