The first well drilled at the Sombrero Project (WC 35 State # 1 well) was placed on production
on July 21st and produced at rates of between 5 to 15 BOPD from the San Andres formation at
approximately 4,520 feet (1,377 metres).
The well will be checked for sand fill this
coming week for an explanation of the
lower than expected rate of production.
San Andres wells in the region typically
exhibit long life production (> 15 years), at
low steady rates of between 15-50 BOPD.
The WC 35 State well will now be
monitored while a decision on drilling an
offset development well is made. Shallow
oil wells in the area typically require
pumping as they do not have enough
pressure to flow without assistance
Sombreo has a blockage but is producing oil flow.
Also Charro project is still to come on line.
- Forums
- ASX - By Stock
- OTE
- Ann: Stagecoach Prospect Update
Ann: Stagecoach Prospect Update , page-5
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries