New refractory lining in the cement industry for example is dried for 48h and then without any feed heatet up within 72h to 1500°C; after that feeding of raw meal is started.
To heat kilns of a size of the LAMP and then cool it down again, doesn't make any sense for two reasons:
1) it's just an unnecessary waste of energy
2) any change in temperature is disadventageously for stability under load within runtime of refractory lining
Therefore an engineer could start firing a kiln if the TOL is internally announced by mail or phone in advance of written affirmation, if not just leave it as it is.
- Forums
- ASX - By Stock
- LYC
- 1st feed to kiln
1st feed to kiln , page-51
-
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.89 |
Change
-0.130(1.62%) |
Mkt cap ! $7.379B |
Open | High | Low | Value | Volume |
$7.97 | $8.02 | $7.86 | $27.21M | 3.442M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 12329 | $7.86 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$7.90 | 8744 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 12329 | 7.860 |
7 | 47641 | 7.850 |
2 | 20556 | 7.840 |
1 | 12401 | 7.830 |
4 | 25523 | 7.820 |
Price($) | Vol. | No. |
---|---|---|
7.900 | 8744 | 2 |
7.920 | 32287 | 5 |
7.930 | 16149 | 4 |
7.940 | 12401 | 1 |
7.950 | 18029 | 6 |
Last trade - 16.10pm 01/10/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online