Last reported depth on 25th May was 4009m for the 9" cemented section at Boreas-1.
Friday's update said that they were drilling out the cement & had pressure tested the casing. BOP was sorted out.
Nxt phase of drilling will b along these lines:
1) Is to drill out the 8.5" section upto apprx 4700m by my estimates (going by their P#2 updates, refer matrix below)
2) This should b their 7" casing point
3) Pressure test & drill out cement
4) Drill the 6" section towards the funzone (ie Montara(?) & Plover reservoir sands).
Here's a rough matrix that I posted a while back, from their last 3 wells. Use P#2 activities as a rough guide for what's nxt. Safe drilling.
Poseidon matrix
- Forums
- ASX - By Stock
- KAR
- b#1 next phase of drilling
b#1 next phase of drilling
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
|
|||||
Last
$1.75 |
Change
-0.020(1.13%) |
Mkt cap ! $1.405B |
Open | High | Low | Value | Volume |
$1.78 | $1.79 | $1.74 | $5.751M | 3.281M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | $1.74 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.75 | 7996 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 1.740 |
1 | 16000 | 1.735 |
9 | 140495 | 1.730 |
6 | 59347 | 1.725 |
10 | 66251 | 1.720 |
Price($) | Vol. | No. |
---|---|---|
1.750 | 7996 | 1 |
1.755 | 84859 | 3 |
1.760 | 57088 | 4 |
1.765 | 35782 | 3 |
1.770 | 5782 | 1 |
Last trade - 16.10pm 15/08/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & Managing Director
Charles Armstrong
CEO & Managing Director
SPONSORED BY The Market Online