It's clear they have had a fair few issues with the new mine with a lot of tweaking required. Production is well below a 2.5m oz per annum capacity.
By my quick calc they have only poured around 900kg in 2 months when full production should be 6.7 tonnes per month.
On a positive note they seem to have resolved the bulk of these issues.
Add to My Watchlist
What is My Watchlist?