Imo, they perforate the gas zone, test, run production tubing and separate the gas zone with oil zone (so in the future gas is produced in tha annulus, oil produced inside tubing) then perforate oil zone and put on production. The "horizontal leg" may include the deviated part that intesect the gas on top. Wish they show us the design.