VPR 0.00% 0.2¢ volt group limited

just 2 weeks to go, page-3

  1. 1,217 Posts.


    To be fair, the conversation I had with Greg two weeks ago held true. These issues are going to be behind us soon, the time in waiting is going to be put to good use as per report.

    The lagging can be completed after the pressure testing and the cooling pipes easily installed by next month along with roof cabling and commissioning.

    I am a bias SH T29 now.

    BB

 
watchlist Created with Sketch. Add VPR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.