Hi Gilbert was supposed to have been contracted and slotted to be drilled within 3 months from the prospectus date (2004 ) I am sure that it should be drilled after this well for BPT and Anzon is completed Cheers Towie
- Forums
- ASX - By Stock
- GOP
- check out gop/gopo boys!
GOP
gippsland offshore petroleum limited
check out gop/gopo boys!, page-10
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)