X64 0.00% 57.0¢ ten sixty four limited

why the rise?, page-7

  1. 187 Posts.
    lightbulb Created with Sketch. 8
    Kermit345,

    I think production for this quarter as a result of the fire will be between 14-15K ozs followed maybe by 18-20K in the December quarter.

    I believe after that, once the main shaft is complete, they will be back to steady state as there wont be any restriction on haulage capacity.

    The current mill can then treat ore at maximum capacity (ie 1000 tpd) and at hopefully at higher grades, until such time as the new mill comes into play by mid 2013.

    One thing that i do hope doesnt happen is that they run short of money as a result of lower production.
 
watchlist Created with Sketch. Add X64 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.