looking quite good thus far, perhaps we can start believing the possibility that the size of the structure might in fact be moving ever so closely to the upper scale of their estimates....6-7tcf
long way to go, but so far so very good
- Forums
- ASX - By Stock
- MEO
- gas in the elang-plover, gas in sandstone abov
gas in the elang-plover, gas in sandstone abov, page-4
-
-
- There are more pages in this discussion • 100 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)