Ive never really thought about a heron east until you mentioned it recently Daz, but this along with heron west plus lower GWC could really blow the amount of gas MEO have in this permit well over there current estimate. No doubt 3D data to be shot of these areas if ENI find what there looking for in this well.
Thinking Heron east be between Structural spill point heron and Evans shoal as on page 7 and 6 11 of link.
http://www.ezdataroom.com/pdf.php?id=209
MEO Price at posting:
21.5¢ Sentiment: LT Buy Disclosure: Held