GBG 0.00% 2.9¢ gindalbie metals ltd

first shipment, page-164

  1. 2,513 Posts.
    lightbulb Created with Sketch. 131
    This is from the quarterly report:

    "First production of magnetite concentrate as part of the commissioning and commencement of the production ramp-up is scheduled to occur in late October or early November 2012"

    With the AGM scheduled on the 16th of November. I would speculate that the above time table for the magnetite will be met. So maximum wait is three weeks imo
 
watchlist Created with Sketch. Add GBG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.