Jazzasax,
it would be the shale/silt section which collapsed, not reservoir. Here's why:
They cased within 199m of bottom hole.
115m of the bottom hole is sandstone reservoir, therefore;
They were only able to case 46m of the 130m shale and silt sequence, leaving 84m uncased. This is where the well diameter is constricted (hence attempt to ream), and decision to install narrower diameter slotted liner.
- Forums
- ASX - By Stock
- MEO
- Ann: Heron South-1 Progress Report No. 14
Ann: Heron South-1 Progress Report No. 14 , page-28
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MEO (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham, MD & CEO
James Graham
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online