All going very well!!
So Report #9 - ” Mudlog gas shows were observed to increase over the interval from 2,776mMDRT to 2,794mMDRT in the Baong sands."
Report #10 - " Following stabilization of mud losses, drilling continued to the planned section TD at 2,962mMDRT in the Lower Baong shale. Gas shows continued to be observed to section TD."
Next....
Jazza