All going very well!!
So Report #9 - ” Mudlog gas shows were observed to increase over the interval from 2,776mMDRT to 2,794mMDRT in the Baong sands."
Report #10 - " Following stabilization of mud losses, drilling continued to the planned section TD at 2,962mMDRT in the Lower Baong shale. Gas shows continued to be observed to section TD."
Next....
Jazza
Add to My Watchlist
What is My Watchlist?