lets not forget Gurame amidst the Heron excitement.
I feel as though we must be having some real success here and this is why
its now almost 9 days since the last report, where we were preparing to drill out of the first target at 2961m into the next target until TD at 3375m
thats 415m
usually would take 3 days
thats given us 6 days to run tests, assuming they immediately cased, plugged back and tested the BAong
I think its likely that MEO decided to run logs and perhaps even cut a core over the Belumai section
was it for gas or oil?
id say if that has occurred we might start prod testing today/tmrw at Gurame
-