Yes I agree. A very good read. Path forward to production is clearly defined down to the point of a detailed site plan, approvals well underway. There were numerous indications of new high grade areas like 5m @ 53gt at Red Dam, 8m @ 19.7gt at Telegraph all planned for new drilling. Waiting to see if SPP is scaled due to oversubscription.
- Forums
- ASX - By Stock
- PXG
- agm presentation out
agm presentation out, page-2
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla