I was also at the meeting and in conversation it was stated the operator of the rig at Guchab is crap. The equipment is shoddy and the operators are not much better.
They are negotiating to try and get the operator of the rig from Kaskara to take over the drilling at Guchab. This guy is a good operator and the forman thinks that they have a diamond drill they can get into the terrain.
If he does not come on board the company may buy their own portable rig and get the own crew. The rig and everything would cost about 200 thousand.
- Forums
- ASX - By Stock
- SBR
- agm
agm, page-6
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
0.001(5.88%) |
Mkt cap ! $6.737M |
Open | High | Low | Value | Volume |
1.8¢ | 1.8¢ | 1.8¢ | $9.9K | 550K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 560917 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.8¢ | 607700 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 560917 | 0.017 |
3 | 357500 | 0.016 |
4 | 883333 | 0.015 |
1 | 187562 | 0.013 |
2 | 290000 | 0.012 |
Price($) | Vol. | No. |
---|---|---|
0.018 | 607700 | 5 |
0.019 | 177818 | 3 |
0.020 | 58500 | 2 |
0.021 | 917008 | 3 |
0.022 | 756786 | 3 |
Last trade - 13.13pm 24/06/2024 (20 minute delay) ? |
Featured News
SBR (ASX) Chart |