CND 0.00% 3.1¢ condor energy limited

and still no word from bkp, page-2

  1. 2,367 Posts.
    5th December 2012
    Operational Update
    Baraka Energy & Resources Ltd (ASX: BKP, RBD: GR)(“Baraka”) provides the following operational updates recently announced by our joint venture partner PetroFrontier Corp. (“PetroFrontier”) regarding their Owen-3H well located on EP-103 and possible Corporate strategies.
    PetroFrontier announcement
    Owen-3H Update
    After 20 days of testing, the Owen-3H well flowed back fluids approximately equal to the amount injected during stimulation and 90% of the amount lost during drilling. However, no hydrocarbons were recovered. As a result the test was stopped and the well shut in pending a further review of the data obtained.
    During the hydraulic stimulation of this well, PetroFrontier utilized an advanced chemical tracer application to allow subsequent flow differentiation from each of the ten ports. The analysis of these tracer samples is ongoing and once they have been fully evaluated, a remedial work over program may be developed and risk assessed for implementation.
    Laboratory analysis of the Owen-3 core indicated porosities ranging from 1.6% to 6.7% and low permeability, all as expected. This analysis also indicated that the core fluids contained 90% oil and 10% water. Oil was observed dripping from the core which indicated that it is "movable". Furthermore, no water was apparent on the logs in either the Owen-3 pilot hole or the Owen-3H well.
    The crew and equipment used to flow test Owen-3H is now contracted to another operator and has demobilized from the Southern Georgina Basin. PetroFrontier has made every effort to source alternative equipment from other Australian service companies to allow operations to continue during the wet season but none is currently available until Q1/Q2 of 2013.
    The Board of Directors and senior management are frustrated with the recent operational results and would prefer to have achieved proof of concept at this early stage of exploration. However, PetroFrontier and Statoil remain positive about the prospectivity of PetroFrontier's massive exploration acreage, which is supported by the favourable Owen-3 core analysis and the recent Total/Central Petroleum farm-in announcement.
 
watchlist Created with Sketch. Add CND (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
0.000(0.00%)
Mkt cap ! $17.91M
Open High Low Value Volume
3.2¢ 3.2¢ 3.1¢ $9.806K 312.2K

Buyers (Bids)

No. Vol. Price($)
5 623450 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 23333 1
View Market Depth
Last trade - 15.56pm 28/06/2024 (20 minute delay) ?
CND (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.