Hi dr d and ya and oilig and others
The missing piece of core also caught my eye when it was released.
Plenty of interesting posts around circulation loss and disappointment at the oil leg at Guarme and even "things" falling down the hole (aka implying bore blocked, I mean really)....
The baong sands are, and have been for several weeks, safely cemented behind the production liner.
no signs of any reservoir compromise whilst drilling the baong sands per se.. If anything, mud weights were so light and proactively conservative that to report the level of circulation loss bodes very, vey well for a positive well result, pardon the pun...
The gas is big at heron, the gas is big at Guarme, but the differene is that at Guarme the porosity and permeability have hit the sweet spot....
- Forums
- ASX - By Stock
- MEO
- somebody please.
somebody please., page-13
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)