That lower 35m section of the Baong Sands must b immaterial, hence the decision to plug back a bit further into the liner.
The gas readings for the Baong sands started increasing from 2776m (rep#9) & the plug is set at 2926m (last report).
So we are looking at apprx 150m gross thknss gas column in the Baong sands behind the 7" liner 2b perforated. How much of that is actually fractured with good permeability will matter more for the upcoming DST.
The cored section was from 2794-2807.4m (rep#10) with 1.04m missing due to possible fracture zone.
I hope they pick this as the first test section & then mayb another test interval somewhere lower, unless they want to save on costs by perforating majority of the reservoir section in 1 go.
Hope we get a gasflare this time around, unlike HS1's RTSTM or GTS.
MEO Price at posting:
12.0¢ Sentiment: Hold Disclosure: Held