re: Ann: SRH 5H Well Successfully Drilled and... Acreage - in the Update of the 5th he refers to cost/performance best obtained in the 4500 to 6000 foot range. So at 4700 he's in the ballpark.
So everything to plan and cost etc. Im not into technical side of this but isnt it just a little unusual for everything to appear so smooth? I mean no problems to date or is this more likely(problems)to occur with the frac or is the drilling the obvious problem area and now of course out of the way with the release of the rig?
- Forums
- ASX - By Stock
- GGP
- Ann: SRH 5H Well Successfully Drilled and Complet
Ann: SRH 5H Well Successfully Drilled and Complet, page-3
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)