Doc
Your last comment about much more 3D being required for Heron. Meo were happy with the resolution of the new 3D conducted on AC/P50 51 verses the old one conducted in 1998. The last 3D on Heron was 2006 perhaps with the lastest advancements a new 3D could pick a sweeter spot.
Meo had the strutural close for Heron South as 130 km2 based on a TD of 4325. Now with a TD of 4454 obviously that has grown for both Heron south and north, hopefully giving them a larger area to find fractures.
I know this thread is Gurame but would like your thoughts on Blackwood with the decision looming for Eni. Looking at what has been presented this strutural close may now be a lot larger than MEO estimates. Found it frustrating with DM's preso that Eni and MEO had a difference of opinion with Blackwood. Thinking if Eni are paying the bill they may be the more conservative of the two.
Add to My Watchlist
What is My Watchlist?