QMN 0.00% 16.8¢ queensland mining corporation limited

Ann: David Usasz Retirement , page-6

  1. 354 Posts.
    lightbulb Created with Sketch. 2
    Another one bites the dust.

    As for the timeline below, its pathetic imo.

    QMC has a three stage strategy to redo the Feasibility Study by early 2014.
    1. Jan-Jun 2013 – Complete resource development and expansion drilling and conduct initial
    metallurgical test work to assess alternative processing routes.
    2. Jul-Dec 2013 - Complete detailed systematic metallurgical test work and mining studies to
    identify the optimal mining and processing routes.
    3. Sept 2013- Mar 2014 – Complete Feasibility Study including engineering studies and
    economic evaluation.
 
watchlist Created with Sketch. Add QMN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.