Today's announcement indicates over 90% recovery through cracking and leaching stage. This coupled with previous announcement of over 70% recovery through the concentration process at Mount Weld equates to over 15% higher recovery than the design case:
Concentrator design 63% recovery, cracking and leach design 87% recovery = 54.8% recovery for both plant processes.
Actual concentrator >70% recovery, actual cracking and leaching >90%, which is at least 63% recovery for both plant processes.
63%/54.8% = 115% of original design case.
This can be either translated into 15% lower costs for these sections or 15% higher production of REO for these sections.... either way is a major win.
- Forums
- ASX - By Stock
- LYC
- 15% high product recovery than design
15% high product recovery than design
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.79 |
Change
-0.010(0.15%) |
Mkt cap ! $6.346B |
Open | High | Low | Value | Volume |
$6.84 | $6.88 | $6.78 | $12.19M | 1.789M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 5667 | $6.78 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.80 | 6940 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 5667 | 6.780 |
3 | 19283 | 6.770 |
1 | 8083 | 6.760 |
2 | 9083 | 6.750 |
1 | 8083 | 6.740 |
Price($) | Vol. | No. |
---|---|---|
6.800 | 3996 | 3 |
6.820 | 13083 | 3 |
6.830 | 8083 | 1 |
6.840 | 8083 | 1 |
6.850 | 19913 | 8 |
Last trade - 16.10pm 27/08/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |
The Watchlist
SBW
SHEKEL BRAINWEIGH LTD
Dani Nadri, Country Manager Australia
Dani Nadri
Country Manager Australia
SPONSORED BY The Market Online