I had only a small gamble here, so I suppose that entitles me to post something.
IMO, in the absence of finding a second play to fall back on, they should consider talking up the whole of FP's potential while re-drilling the first hole .
If the first hole redrilling doesn't pan out they can then fall back on the other holes to be drilled at FP as their fall back position.
Possible raising the money for the whole of FP drilling before redrilling the first hole.
Therefore the projects to fall back on are the whole of FP.
Maybe I send this of to Vil mangement for comment.
Cheers EWO.
- Forums
- ASX - By Stock
- VIL
- einstein
einstein, page-9
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VIL (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online