I understand how you feel. please express your feelings to ICN.
I do understand there is an announcement to be released very soon. and as usual BPT is holding things up for ICN.
BPT are power mongers.
There will be a Gas flow, like that of BPT moonta-1, I have been told.
we must remember that these workers on site are working in very extreme temps of near 50deg C. and I have been told that a number took sick with, I assume heat stroke.
Beech is in JV with ICN and if there is No Gas Flow at Halifax-1, there will no longer be a JV with BPT.
but if there really is the 300 Trillion cf of gas, well that's amazing. !
unfortunately we will have to sit it out for another few months with flow tests.
But share prices should escalate from there on.
- Forums
- ASX - By Stock
- ICN
- halifax-1 lng gas fraccing very slow ,no info
halifax-1 lng gas fraccing very slow ,no info, page-24
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ICN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.608M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ICN (ASX) Chart |
Day chart unavailable