This is the report Pete referred toO.
Once evaluation of the Kockatea is complete, the interval will be isolated and the plug milled out between the Kockatea Shale and the Carynginia Formation. This will enable flow back and clean up to recommence on the Carynginia interval. This work will commence as soon as the necessary equipment becomes available, currently estimated to be towards the end of this month. It is anticipated that the testing of all remaining zones (refer Figure 1) will take approximately 3-4 months.
DM. Email away!
"Does this include Cray, IRCM and HCSS."
Add to My Watchlist
What is My Watchlist?