junior oilers january 25/26, page-13

  1. pj
    2,090 Posts.
    re: junior oilers january 25/26 - re 1.pte 2. ppp Hi BG,

    Thanks for the learned interpretations.....

    Due you fancy one of those $1.8m Ferrari's?? Might fit the bill.

    The 25% was from memory so I have checked back and here it is from PPP's quarterly released 31/10/02. Incidentally this contained a give away clue where their % interest is listed at 15% in the table but 40% in the paragragh below. The clue being farmout was on, but only announced to market a couple of days later. Not that I took any action on it at the time!

    I suppose this will look a mess (I just pasted it), but here we go:

    PAN PACIFIC PETROLEUM NL - DRILLING SCHEDULE

    PROSPECT PERMIT PPP POTENTIAL + RISK ++ PLAY TYPE LIKELY
    EQUITY (MMBBL) % DEPTH DATE
    2002

    Argos WA254P 2.99 4-8 20 Lower Barrow Nov
    Taunton TL2 10.00 3-5 26 Mardie Nov
    Immortelle TP7 4.16 15-50 24 Top Barrow Nov

    2003

    Tui PEP38460 15.00 200-700 26 Kapuni Feb
    Montgomery WA149P 10.00 30-70 15 Barrow/ Dupuy Feb

    UPCOMING DRILLING SCHEDULE

    Pan Pacific has conducted its own assessment of the Flinders 3D
    seismic and considers Mosman, Clove and Hyssop attractive prospects
    that should be drilled as soon as the rig schedule permits.

    PROSPECT PERMIT PPP POTENTIAL + RISK ++ PLAY TYPE LIKELY
    EQUITY (MMBBL) % DEPTH DATE
    2002

    Mosman-1 TL2 23.17 20-45 19 Lower ) under
    Barrow ) discussion
    Clove-1 TL2 23.17 30-50 24 Lower )
    Barrow )
    Hyssop TP7 4.16 12-30 19 Top )
    Barrow )
    + PPP midcase to upside estimate
    ++ PPP estimate of midcase chance of success

    And from release 23/1/03

    Mid-case potential for the Tui prospect is estimated to be 700 million barrels in the primary D Sand objective, with a further 400 million barrels potential in the Moki and 50 million barrels in the Kapuni F Sands.


    pj
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.