And with the new levee around the Baralaba mine they should avoid riverine flooding - only the rain that actually falls in the pit should need to be pumped out.
The delay for COK should be of the order of a week, rather than the weeks to months they suffered last time.
Add to My Watchlist
What is My Watchlist?