daytrading jan 29 morning, page-129

  1. 1,244 Posts.
    lightbulb Created with Sketch. 180
    AXE: Drilling schedule just released

    1. Drilling of projected regional extensions to the Campoona Shaft graphite deposit.
    2. Drilling to test for copper/gold targets at Robertstown near Burra.
    3. Drilling to test anomalous EM graphite targets on Eyre Peninsula tenements.
    4. Drilling of the epithermal gold target at Bartel near Cleve on Eyre Peninsula.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.