re: Ann: Gibb Maitland No1 Sidetrack - Weekly... Slampoil ,
If there was greater availability of rigs , time etc , wouldn't they just start again with a new hole rather than attempt to reuse a piddling 900m of drilling , cemented casing and surface infrastructure ?
Isn't a side-tracked well more likely to get stuck than one which goes straight down ?
Any idea how many degrees the side track would deviate from the vertical ?
- Forums
- ASX - By Stock
- NSE
- Ann: Gibb Maitland No1 Sidetrack - Weekly Drillin
Ann: Gibb Maitland No1 Sidetrack - Weekly Drillin, page-26
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)