re: Ann: Gibb Maitland No1 Sidetrack - Weekly... Hi Striebs
There no problem using this existing 900m of hole, saves time and money. and side tracking a common oil field technique.
Even moving the rig 1 metre to the right would cost more.
- Forums
- ASX - By Stock
- NSE
- Ann: Gibb Maitland No1 Sidetrack - Weekly Drillin
Ann: Gibb Maitland No1 Sidetrack - Weekly Drillin, page-27
-
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)