PYM 0.00% 0.0¢ pryme energy limited

Ann: Completion of Rosewood Plantation 21H No.1 U, page-9

  1. 56,544 Posts.
    lightbulb Created with Sketch. 258
    re: Ann: Completion of Rosewood Plantation 21... I would have though they'd need to prepare the well bore for the casing, set and cement the casing, perforate the the liner to correspond with the fractures, maybe acidize, reduce the load water, demobilise the drill rig, then begin the flow test. All takes time, but I'll be happy to be wrong but also mechanical issues are possible.

    The may be well on the way Cham - I also hope so.

    We may need oil tanks, prodution facilities, a line connecting the gas to a sales line etc.

    Soon enough, I hope PYM will announce the amount of intervals and aggregate length.
 
watchlist Created with Sketch. Add PYM (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.